Build our temple, one block at a time

Help build a permanent home for our monks and a place of peace for everyone, one square foot at a time.

Funding Round 1

The main building is 800 square feet. We have divided it into 800 blocks, each one square foot. Reserve as many blocks as you wish. Each block is a pledge of $125, and together they make up the $100,000 Round 1 goal.

goal
$100,000
main building
800 sq ft
per block
$125
Reserve your block

Our temple

About the project

While our property has provided us the capability to conduct events and basic residence for monks during the summer, we are lacking the facilities for year-round residence and Dhamma school and other programs. Over the past few years, we considered several options for developing the temple. During our recent community meeting under the leadership of monks from Connecticut and New York, we decided that the most cost-effective approach would be to develop the existing red building to provide the required facilities.

We plan to approach this project in three phases as follows:

The existing red building with the area for each renovation phase outlined: Phase 1 is the single-story back part, Phase 2 the first floor of the main building, and Phase 3 the second floor

The journey

Project phases

  1. Phase 1

    In progress

    Renovate the single-story back part of the main red building to provide two rooms and living space for monks.

    Cost estimate
    $100K – $150K
    Current status
    Construction started in October 2026, with completion estimated by December 15, 2026. Active fundraising in progress.
  2. Phase 2

    Upcoming

    Renovate the first floor of the main red building to provide meeting halls for the Dhamma school and CTMC events.

    Cost estimate
    TBD
    Current status
    Preliminary investigations
  3. Phase 3

    Upcoming

    Renovate the second floor of the main red building to provide additional rooms and a kitchen for monks.

    Cost estimate
    TBD
    Current status
    Preliminary investigations

Ways to give

Give with Zelle or Venmo

Scan to give

Scan a code with your phone. Reserve your blocks first, then include your reservation ID with your payment.

  • Venmo QR code. Scan it with your phone to send your donation with Venmo.

    Venmo

  • Zelle QR code. Scan it with your phone to send your donation with Zelle.

    Zelle

Schedule

Project schedule
WhenMilestone
NowPhase 1: in progress. Construction started in October 2026; estimated completion December 15, 2026
TBDPhase 2: first-floor meeting halls (preliminary investigations)
TBDPhase 3: second-floor rooms and kitchen (preliminary investigations)

Phase 1 Expenses (Estimate)

Phase 1 renovation steps with estimated costs
#DescriptionEstimated laborEstimated material
1Replace exterior walls and doors/windows (contract)$29,000 (labor and material)
2Replace roof structure and finish (contract)$20,000 (labor and material)
3Interior framing and level floor structure$5,000$2,000
4Ceiling finishes$800$1,900
5Electrical wiring$7,000 (labor and material)
6Plumbing (3 toilets, pantry)$900$1,200
7HVAC – baseboard$500$1,200
8Insulation$1,000$2,000
9Sheetrock and finish$1,300$2,100
10Interior doors, two exterior toilet doors (8)$800$2,100
11Paint$900$1,800
12Flooring finish$1,000$1,200
13Toilets finish (2)$1,800$2,800
14Pantry$1,900$3,800
15Other (dumpsters, permits, etc.)—$4,100
Total$71,900$26,200

Contract amounts cover labor and material and are counted in the labor total. These are estimates and may change.

Phase 1 Expenses (Actual)

Phase 1 expenses paid so far
ExpenseDateAmount
Dumpster 1Oct 26, 2026$872.00
Home Depot – materials for the roofOct 26, 2026$12,852.31
Contractor labor – cash checkOct 27, 2026$5,040.00
Dumpster 2Nov 5, 2026$872.00
Home Depot – walls – materialsNov 2, 2026$4,000.00
Home Depot – walls – materialsNov 2, 2026$4,442.27
Town – permitOct 25, 2026$500.00
Labor fee for walls (40% of total)Nov 13, 2026$4,300.00
Total spent to date$32,878.58

Phase 1 floor plan

Phase 1 renovation floor plan showing a living area, two rooms, a bathroom, a pantry and a verandah
The proposed floor plan for Phase 1

Frequently asked questions

What does reserving a block mean?

Reserving a block is a pledge to donate $125 toward the Phase 1 renovation of the main red building. No payment is taken on this website. CTBV will contact you with how to complete your gift.

How do I pay for my pledge?

After you reserve, you will see payment instructions and your reservation ID. Please include the reservation ID with your payment.

Can I stay anonymous?

Yes. Your name is only shown publicly if you tick “Display my name publicly”. Otherwise your blocks are shown as “Anonymous”. Your email and phone number are never shown publicly.

Can I change or cancel my reservation?

Please contact us at info@ctbv.org with your reservation ID and we will help.

Is my donation tax-deductible?

Yes. All donations to the Connecticut Buddhist Meditation Center are tax-deductible. CTBV will send you a tax-deduction letter at the end of the year for your records. Our EIN (tax ID) is 47-3500828.

More questions? See the full FAQ.

Every square foot counts

Reserve one block or many, and be part of the foundation of our temple.

Reserve your block